02

Air- and liquid-cooled AI factories.

An AI factory is a designed room-or-rack of GPUs plus cooling, networking, storage, and software so models can run on-site. Air-cooled for many enterprise halls. Liquid-cooled when density and thermal load require it.

The factory

A factory is a working environment, not a pile of accelerators.

We design for thermal efficiency, density, and reliability — then procure, integrate, and operate. Same partner at rack-scale as at a single workstation.

Air-cooled

For many enterprise halls: high-density GPU systems within the existing thermal envelope, with fabric and storage specified together.

Liquid-cooled

When density and thermal load require it: direct-to-chip or rear-door liquid, manifolds, and rack integration designed as one system.

Drag to rotate · liquid-cooled rack

01

Thermal efficiency

Air where the hall can carry the load. Liquid when density and thermal design require it. We size cooling as a first-class constraint, not a facilities afterthought.

02

Density

Rack-scale GPU systems packed for the power and cooling envelope you actually have. The factory is designed to the room, not copied from a brochure.

03

Reliability

Redundancy, maintainability, and operational procedures so the factory stays a production system. Engineered for thermal efficiency, density, and reliability.

04

Rack integration

Power, cooling manifolds, networking, cable plant, and mechanical integration delivered as one system. The unit of work is a working rack or hall.

05

Reference architectures

Repeatable patterns for workstation, cluster, air-cooled factory, and liquid-cooled factory — with a migration path between them.

06

Deployment

Physical install, fabric, storage, Kubernetes, AI software stacks, and operational readiness. Same partner from architecture through go-live.

Operations floor in a private AI environment

Deployment includes the stack.

Rack, cool, network, Kubernetes, AI software, operational readiness. We do not drop a box and leave. Migration to next-generation platforms is documented at design time.

How we work

Request a briefing

Design a factory brief.

Tell us the hall, the density, and whether air still works. We will say plainly if liquid cooling is required — and if we are the right partner.

No PDF download required. We reply to work emails.